
Improvement of energy efficiency with the renewal of generation in air conditioning and domestic hot water installations by means of efficient aerothermal chiller systems.
Location
El Salobre, Gran Canaria
Country
Spain
Product areas
Air treatment
Water treatment
Water treatment
Client
Satocan
Type of work
Air conditioning, DHW, Climate control
Challenge
The customer had high propane gas consumption for DHW production and, in addition, the need to heat swimming pools due to tour operators' requirements, and the air conditioning systems were in poor condition.
At a glance
4.7 years
Amortization period
655.000
Emissions savings Kg Co2 / year
What Alfa 90 did
A system was designed with two water-water chiller plants for the simultaneous production of cold for the hotel's air conditioning and heat for the preheating of the hot water and the air conditioning of the swimming pools.