Improvement of energy efficiency at Hotel Lopesán Abora Continental, through the renovation of the thermal installation with a high temperature aerothermal system.

Location
Playa del Inglés, Gran Canaria
Country
Spain
Product areas
Heat
Client
Hotel Lopesan Abora Continental
Type of work
Hotel accommodations

Challenge

Excessive propane gas consumption and poor condition of the thermal installations.

De un vistazo

At a glance

326.108
Emission savings Kg Co2/year
3.1 years
Amortization period

What Alfa 90 did

The installation of two high temperature heat pumps of 116 kW each is proposed to replace the existing propane gas boilers for the production of hot water.

a similar project?

Contact with us