
50 kW self-consumption photovoltaic installation for Binter Tenerife
Location
Los Rodeos, La Laguna, Tenerife
Country
Spain
Product areas
Renewable energies
Client
Binter Canarias
Type of work
Renewable Energies, photovoltaic
Challenge
Binter has intensive electricity consumption at its logistics center in Tenerife, and proposed a photovoltaic installation on the roof to reduce it as much as possible.
At a glance
83.292
Energy savings in kW/year
25 years
Shelf life
50 kW
Installed power
What Alfa 90 did
Alfa 90 designed and installed a photovoltaic plant adapted to the type of roof, optimizing energy consumption.