
Complete renovation of thermal installations by means of low enthalpy geothermal chillers, heat pumps and renovation of filtration and hydropressure system.
Location
Gran Canaria
Country
Spain
Product areas
Air treatment
Heat
Hydropressure
Renewable energies
Water treatment
Heat
Hydropressure
Renewable energies
Water treatment
Client
H10 Hotels
Type of work
Tourism - Hotel
Challenge
High energy cost in the generation of heat and cold. Obsolescence in thermal installations and in swimming pools and spas.
At a glance
1200 kW
Power kW installed
1.500 m3
of heated swimming pool
1.158.637
Emission savings Kg Co2/year
What Alfa 90 did
Renovation of the air conditioning system for a hot and cold installation by means of a 1200 kW plant of low enthalpy geothermal chillers condensed by sea water and support with high temperature heat pumps for the supply of cold and heat to the whole hotel and the air conditioning of the 1,700 m3 swimming pools. The proposed solution is managed by Alfa90 with a financial aid of 160,000 euros from the energy efficiency and renewable energy order of the Government of Cantabria, which allows an amortization in 4 years.