
Improvement of energy efficiency in Hotel Barceló Contemporáneo. Renovation of thermal installation for a multipurpose system with heat recovery.
Location
santa cruz de Tenerife, Tenerife
Country
Spain
Product areas
Renewable energies
Client
Barceló Hotels
Type of work
Renewable energies Aerothermal
Challenge
Chiller in poor condition and lack of heat recovery system to improve energy efficiency
At a glance
2,77
Simple amortization years
25.000
Emissions savings Kg Co2 / year
320
Power kw installed
What Alfa 90 did
Replacement of chiller with a four-pipe multipurpose unit for air conditioning and heat recovery for hot water preheating.