Production of DHW with solar energy for 1,000 bioclimatic subsidized housing units
Location
Las Palmas de Gran Canaria
Country
Spain
Product areas
Renewable energies
Client
VIsocan, Country City
Type of work
Renewable Energies
Challenge
It is intended to build 1,000 homes in 10 blocks with the particularity that they must be homes qualified as bioclimatic and efficient.
At a glance
2.270
Power kW Installed
280.000
CO2 emissions savings/year
160.000
fuel consumption savings/year
What Alfa 90 did
Two installation typologies are proposed: On the one hand a centralized system for the production of hot water with solar thermal energy supported by gas boilers. On the other hand, a centralized system for the production of hot water with solar thermal energy with an independent support (decentralized) with thermosiphon effect electric water heaters.